4. Production Information

To produce drawings and information in addition to the Building Control drawings as required for the construction of the project. This information will likely include room elevations, door and window schedules, finishes schedules and construction details required for the contractor to build the proposals as designed.

As an RIBA Chartered Practice we follow a process of work which is divided into stages. 

​

The RIBA Plan of Work organises the process of briefing, designing, constructing and operating building projects into eight stages and details the tasks and outputs required at each stage.