top of page

0. Measured Survey

To carry out a measured survey of the existing property and land as required to produce a record set of survey drawings. This information is required for submission to Planning and Building Control as well as forming the base for developing the design drawings.

Grey Bear RIBA Stage 0

As an RIBA Chartered Practice we follow a process of work which is divided into stages. 

​

The RIBA Plan of Work organises the process of briefing, designing, constructing and operating building projects into eight stages and details the tasks and outputs required at each stage.

bottom of page